Puerta del Mar Initiative
Opportunity
Rather than simply replacing what was there, we have designed a plan to rebuild the dock, access stairs and beach area to be:
Reinforced structural foundation engineered for long-term durability and stability.
Elevated platform design to better withstand storm surges and rising water levels.
IPF-grade concrete slab built for superior resistance to water infiltration and cracking.
Optimized docking layout with clearly designated embarkation areas and organized boat parking zones.
We are inviting you to be part of rebuilding something that will serve both our project and our community for years to come.
Clean up the beach rubble and marine debris
Reuse recovered coral to create reinforced coral-cement foundation bags
Fabricate the structural rebar base
Pour the new reinforced concrete slab
Install wooden posts with integrated solar lighting
Install railing and safety elements
Install signage and sponsorship recognition wall
Renovate stairway with integrated accessibility ramp
This is not just a rebuild — it’s a permanent upgrade in safety, strength, and design.
The Plan
How can you help?
Donation levels
Beach Roots ($500,000 COP):
One complimentary night at Tiny Village Cartagena
Name and logo on sponsorship board with QR code to website or Instagram
Dockside Circle ($1,000,000 COP):
One complimentary night at Tiny Village Cartagena
Name and logo on sponsorship board with QR code to website or Instagram
TVC “Playa” membership (10% off stays and events through December 2026)
Island Pillar ($2,000,000 COP):
One complimentary night at Tiny Village Cartagena
Name and logo on sponsorship board with QR code to website or Instagram
TVC “Villager” membership (20% off stays and events through December 2026)
How to contribute?
USA 🇺🇸
Transfers via Zelle:
Tiny Village Resource Holdings, LLC
info@tinyvillagecolombia.com
Card Payments via Stripe:
Colombia 🇨🇴
Transferencias por Bancolombia:
Tiny Village Colombia SAS
Cuenta Ahorros: #786-000-137-76
Pagos por Wompi:

